- Test & Measurement
-
Analyzers
-
Oscilloscope
-
Meters
-
Generators
-
DC Power Supply
-
Optical Communications
-
Other Test Equipment
-
Accessories
-
Probes
-
Software
-
AC Power Sources
-
Accessory Kits
-
Amplifiers
-
Antenna
- View All Categories >>
-
- Semiconductor & PCB
-
Front End
-
Back End
-
PC Board Assembly
- View All Categories >>
-
- Surplus & Liquidation
- Computers & Electronics
- Construction
-
Aggregate Equipment
-
Air Compressors
-
Asphalt / Pavers / Concrete Equipment
-
Compactors
-
Cranes
-
Crawler Loaders
-
Dozers
-
Drills
-
Dumpers
-
Excavators
-
Forestry Equipment
-
Forklifts
-
Generator Sets
-
Lifts
- View All Categories >>
-
- Biotech & Life Sciences
-
Biotechnology
-
Cell Counters
-
DNA Sequencers
-
DNA Synthesizers
-
Densitometers
-
Electrophoresis
-
Electroporation
-
Fermenters / Bioreactors
-
Flow Cytometers
-
Gel Dryer
-
Hybridization Ovens/Incubators
-
Immunoassay Systems
-
Microarray Scanners
-
Microplate Dispensers
- View All Categories >>
-
- Machinery
-
Abrasives
-
Air Compressors
-
Air Cooling & Heating Equipment
-
Bar Machinery
-
Bending & Forming Equipment
-
Boring Mills
-
Broaching Machines & Keyseaters
-
CNC Machinery
-
Chemical & Processing Equipment
-
Chip, Recycling & Scrap Equipment
-
Cleaning, Painting & Washing Equipment
-
Coil Processing Equipment
-
Construction Equipment
-
Die Casting Machines
- View All Categories >>
-
- Commercial Trucks
-
Heavy Duty Trucks
-
Medium Duty Trucks
-
Light Duty Trucks
-
Trailers
- View All Categories >>
-
- Chemical Equipment
-
AGITATORS
-
AIR FIN COOLERS
-
BLENDERS
-
BLOW MOLDERS
-
BLOWERS
-
BOILERS
-
CENTRIFUGES
-
COLUMNS
-
COLUMNS DBL DIA
-
COMPLETE PLANTS
-
COMPRESSORS
-
CONVERTERS
-
CONVEYORS
-
COOLING TOWERS
- View All Categories >>
-
- Apparel and Textile
-
Textile Machinery
-
Apparel & Textile Machinery Parts
-
Apparel Machinery
-
Home Textile Product Machinery
-
Apparel Accessories Machinery
-
Leather Production Machinery
- View All Categories >>
-
- Medical Equipment
-
Beds, Stretchers and Furniture
-
Cardiology
-
Consumables and Supplies
-
Cosmetic
-
Defibrillator
-
Dental
-
EMS/Rescue
-
Endoscopy
-
Exam Room
-
Homecare/Rehab
-
Imaging
-
Laboratory
-
Monitors/ICU/CCU
-
Neonatal
- View All Categories >>
-
- Printing Equipment
-
Press
-
Prepress
-
Postpress
-
Guillotines
-
Packaging
-
Misc
-
Flexo Printing
-
Web offset
-
Screen Printing
-
Package deals
-
Spare Parts
- View All Categories >>
-
- Packaging Equipment
-
Accumulators
-
Bag Dumps
-
Bag Sealers
-
Bagging Machines
-
Blister Packaging Lines
-
Blister Packers
-
Blister Sealers
-
Blow Fill Seal
-
Bottle Rinsers
-
Canning Equipment
-
Cap Sorters
-
Cappers
-
Cartoners
-
Case Erectors
- View All Categories >>
-
Three Mistakes Could Cost Builders Thousands
05/01/2013 19:16:57
Contractors throughout the construction industry in Australia are exposing themselves to tens of thousands of dollars in losses as a result of less-obvious mistakes regarding payment and administrative processes, a Sydney-based debt recovery specialist says.
In a webinar last week and subsequent interview, Contractors Debt Recovery managing director Anthony Igra outlined three areas he says are easily overlooked but can lead to payment disputes and episodes of non-payment.
1)Failure to document ‘secondary’ agreements.
Igra says a significant cause of problems revolves around a failure to document what he calls ‘secondary’ agreements – informal and seemingly harmless agreements contractors make with clients which end up in payment disputes.
A civil contractor, for example, might agree to a client request not to take the spoil off site for a week to allow the client to use it even though removing the spoil was part of the scope of his contract. In the event of a payment dispute, Igra says, the client may claim, say, $50,000 in costs to remove the spoil and try to back-charge the contractor for this amount even though the client used the spoil and specifically asked the contractor leave it on site.
“I have a dispute right now with a similar arrangement where the sub-contractor [for a steel fixing job] was behind because the materials didn’t arrive on time,” Igra explains. “He was behind and the program was so jammed up that the client said ‘look, we’ve got other subcontractors we’d like to throw a bit of work to, do you mind if they do this part of your work?’, and my fellow said ‘yeah – cut it out of my contract and give it to them and we’ll finish this bit.”
Now, Igra says, the client does not want to pay, adding that “the story is, ‘you categorically refused to finish your contract works, it cost us another $150k to get it finished, and we don’t owe you anything.”
Igra says small requests such as this need to be treated with the same reverence as contract variations and properly documented. If not, he says, problems could occur down the track.
Anthony Igra
2) Inconsistent management of variations.
Igra says a second area of concern revolves around a lack of consistency in how variations are managed and documented. In a project with 15 variations, for example, he says only two might be formally documented on a variation form, with a further four listed in email agreements and the other nine having no documented agreement of any kind – a scenario he says indicates the contractor in question has no consistent way of recording variations.
To combat this, Igra recommends two steps. First, contractors need to write out clear business rules governing how they respond to variation requests. Second, there are a range of things the contractor can standardise, such as forms to document variations, the point at which prices and costs are supplied (before, after, or within a day of starting once you’ve realised what’s involved), and email templates used to confirm approvals. Contractors could also have standard approaches as to which staff members quote variations and authorise prices.
3) Contracting poorly.
Igra says a final problem area involves a failure on the part of contractors to correctly identify who they are actually contracting with, with many doing business with a business name and not looking behind this to discover the legal entity – whether that is a person, group of partners, trustee, company or otherwise – that will be actually responsible for payment.
A number of times, he says, this has led to contractors obtaining favourable decisions in payment adjudications which turn out to be unenforceable because the action was against a business name which is not a legal entity and cannot be sued. This is not to mention other possible problems, such as the entity responsible for payment turning out to be a company with only $1 or $2 in assets.
When making a contract, Igra says it is imperative contractors ask for ABN numbers and research those numbers through ASIC or the Australian Business Register to determine exactly with whom they are making a legal contract and who exactly will be paying for the work.
“Too often, contractors don’t look past the business name because they don’t ask for ABN numbers to do proper research of who it is they are actually in a contract with,” Igra says. “Quite often, I’m the one who uncovers the fact that they are working as a trustee for some kind of obscure trust or for a family partnership where we don’t know who the family members are.”

