Sorry, the search criteria can not be empty
Search
View All Categories
Seasonal Sale! As usual see

Aker Solutions to deliver AMC Connector in 2012

04/10/2013 00:06:38

 

Norway-based engineering and construction group Aker Solutions’ AMC Connector, a future new-build subsea installation and construction vessel, has finalised its vessel specs, which will be delivered in 2012.

 

With a total payload capacity of 9, 000 tonnes of subsea power cables or umbilicals, the vessel will be equipped to target the deepwater installation segment. AMC Connector - previously called Aker Connector - will be equipped with two turntables for high voltage power cables or subsea umbilicals: one 6 000 tonnes capacity on deck and another 3 000 tonnes capacity below deck. With a total product payload of 9 000 tonnes, AMC Connector will be able to take on highly complex and sizeable installation projects. At full payload the 157 x 32 metres ship will boost a transit speed of 16 knots. In addition, the vessel's design enables safe and efficient operation in higher waves than most other high-end construction vessels. AMC Connector will operate at significant wave height of 4-5 metres. The vessel will be equipped with two heave-compensated offshore cranes - with 400 and 50 tonnes capacity respectively - that can operate down to 3, 000 metres water depth. She will have two 3, 000 metres capacity, remotely operated vehicles (ROVs) onboard and can accommodate 140 people. AMC Connector is a multi-purpose ship which will be a highly competitive cable and umbilical installation vessel, but is also equipped to perform deepwater construction work as well as other installation jobs. Within a few days the on-deck modules can be removed from the deck, freeing up a total space of approximately 1, 500 square metres. This will enable transport and installation of large spools and jumpers as well as subsea structures and manifolds. AMC Connector is built by STX Europe and will be outfitted at their yard at Søviknes, Norway. She will be ready for operations from Q1 2012. Subsea power cable provider ABB has already secured the vessel for installation campaigns during 2012 and 2013.